Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

1875 Taylor

CDPHE Discharge Permit for Construction Activity COR-411758


Construction Start Date: 3/8/21

State of Colorado Permit Certification

COR411758_1875 Taylor Permit Certificate (pdf)Download
COR400000 Amended January 2021 (pdf)Download

Stormwater Management Plan

1875 Taylor SWMP (docx)

Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

BMP basic pack for plans (pdf)Download
Details Loisville (pdf)Download

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

Erosion control map base (pdf)

Download

detention pond detail (pdf)

Download

Landscape details seed mix (pdf)

Download

1875 taylor ECP active (pdf)

Download

Site Contacts

Operator(s)/Permittee:

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Alcorn Construction Inc.

Derek Cummins

Director of Operations

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303)-986-7900 

Owner(s):

Operator(s)/Permittee:

Operator(s)/Permittee:

Stuart Platt

Partner

Silver Point Development 

3801 E Florida Avenue, Suite 400

Denver, CO 80210 

303  332 4207

stuartplatt@silverpoint-development.com

Project Manager:

Operator(s)/Permittee:

Project Manager:

Kyle Mclean

Project Manager

Alcorn Construction Inc.

12081 W Alameda Pkwy #510

Lakewood, CO 80228

Phone #: 720.512.6175

Email: kyle@alcornci.com

Superintendent:

General Superintendent:

Project Manager:

  

Cooper Quinn

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

720-416-4138

cooper@alcornci.com



General Superintendent:

General Superintendent:

General Superintendent:

  

Randy Mitchell,

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 994-1715 

SWMP Prepared By:

General Superintendent:

General Superintendent:

  

Open 8 Consulting

Brian Garber

Qualified Stormwater Manager

4416 Lazy K Drive

Castle Rock, CO 80104

(303)-459-8336 

brian@open8.org

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Staff Qualifications

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

1875 Taylor LOC (2) (pdf)Download
Soils report (pdf)Download
1875 T SITE INFORMATION FOR THE STORMWATER MANAGEMENT PLAN (docx)Download

MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Files coming soon.

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by Stormpromax.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary, by Open 8 Consulting.   To request access contact Open 8 at brian@open8.org


Stormpro max is accessed at the following address: https://www.stormpromax.com


Spill Response Procedures

Spill Response Plan (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: https//earthxswmp.us/ 

Assistance, or additional access priority can be provided by contacting Brian Garber  (303)495-8336 or Matthew Fowler (719)922-4183


Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers