CDPHE Discharge Permit for Construction Activity COR-4????
Construction Start Date: Not started
Station 53 SWMP (pdf)
DownloadNote: Active Site maps are specifically indicated. Additional Maps are for reference.
Files coming soon.
Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details
Derek Peterson
VP Operations
Wonderland Homes
5660 Greenwood Plaza Blvd. Suite 101-N
Greenwood Village, CO 80111
(303) 604-0004
Cell: (303) 909-5072
(designated as Qualified Stormwater Manager)
Jack Boyd
Land Development Mgr.
Wonderland Homes
5660 Greenwood Plaza Blvd. Suite 101-N
Greenwood Village, CO 80111
(303) 604-0004
Boyd@wonderlandhomes.com
(303) 587-3744
(designated as Qualified Stormwater Manager)
Ryan Todd
Wonderland Homes 5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111 rtodd@wonderlandhomes.com Cell: (303) 378-0921 (designated as Qualified Stormwater Manager)
Dan Millard
Wonderland @ STATION 53, LLC
5660 Greenwood Plaza Blvd. Suite 101-N
Greenwood Village, CO 80111
(303) 604-0004
Cell: (303) 579-2259
(designated as Qualified Stormwater Manager)
EarthX Environmental
Brian Garber
(303)-459-8336
bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Alcorn Construction Inc.
Derek Cummins
Director of Operations
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303)-986-7900
John Gibson
CEO/Owner
Colorado Yurt Company
28 W. South 4th Street
Montrose, CO 81401
(M) 970-787-5763
Kyle McLKean
Project Manager
Alcorn Construction Inc.
12081 W Alameda Pkwy #510
Lakewood, CO 80228
Phone #: 720-512-6175 kyle@alcornci.com
Chris Emmel
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(720) 595-7972
Trenton Mitchell
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(720) 595-7972
Randy Mitchell,
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303) 994-1715
EarthX Environmental Brian Garber (303)-459-8336 bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Documents used and/or referenced in SWMP preparation.
Permits/Plans Associated with Jurisdictional MS4
Files coming soon.
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGO. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system for this project is provided at:
Assistance, or additional access priority can be provided by contacting Brian Garber or Matthew Fowler

Spill Response Plan (pdf)
DownloadCopyright © 2023 EarthX Environmental - All Rights Reserved.