Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

Carrier West Building A

CDPHE Discharge Permit for Construction Activity COR-411345

State of Colorado Permit Certification

Permit COR411345 (pdf)Download

Stormwater Management Plan

Carrier West SWMP (docx)

Download

Appendix a - Site Contacts

Operator(s)/Permittee:

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Alcorn Construction Inc.

Derek Cummins

Director of Operations

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303)-986-7900 

Owner(s):

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Carrier West, LLC

Tim Brooks

 President 

4800 Osage St,

Denver CO. 80228

 (720)203-1704  

TBrooks@CarrierWest.com

Project Manager:

Operator(s)/Permittee:

Project Manager:

  

Alcorn Construction Inc.

Mark Zens

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303)-986-7900 

Superintendent:

General Superintendent:

Project Manager:


John Price

Qualified Stormwater Manager

  1. Alcorn Construction Inc.
  2. 12081 W. Alameda Pkwy., #510
  3. Lakewood, CO 80228 
  4. (720) 273-926

General Superintendent:

General Superintendent:

General Superintendent:

  

Randy Mitchell,

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 994-1715 

SWMP Prepared By:

General Superintendent:

General Superintendent:

  

Open 8 Consulting

Brian Garber

Qualified Stormwater Manager

4416 Lazy K Drive

Castle Rock, CO 80104

(303)-459-8336 

brian@open8.org

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Staff Qualifications

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

Active Carrier West South (pdf)

Download

Active Carrier West North (pdf)

Download

Carrier West South no archive (pdf)

Download

Carrier West North no archive (pdf)

Download

Carrier West - Civil and Landscape Set (pdf)

Download

Active Carrier West North (png)

Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

Carrier West 950 Vaper Trail CD - Erosion Control Detail (pdf)Download
BMP basic pack for plans (pdf)Download

Site Reference Documentation

Documents used and/or referenced in SWMP preparation. 

Station 53 soils information (pdf)Download
Limits of Construction (pdf)Download
Vapor trail SITE INFORMATION FOR THE STORMWATER MANAGEMENT PLAN (pdf)Download

MS4 Documentation

Permits/Plans Associated with Jurisdictional MS4 

Carrier West 950 Vaper Trail CD - Erosion Control Detail (pdf)

Download

Spill Response Procedures

Spill Response Plan (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

Other Documentation

Added After Original SWMP Preparation

Files coming soon.

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by Stormpromax.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary, by Open 8 Consulting.   To request access contact Open 8 at brian@open8.org


Stormpro max is accessed at the following address: https://www.stormpromax.com


COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: https//earthxswmp.us/ 

Assistance, or additional access priority can be provided by contacting Brian Garber  (303)495-8336 or Matthew Fowler (719)922-4183


Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers