CDPHE Discharge Permit for Construction Activity COR-413217
Construction Start Date: 8/17/21
Edge 470 alpha SWMP (docx)
DownloadSpecifications as approved by Jurisdictional MS4, General Specifications & Grading Details
Alcorn Construction Inc.
Derek Cummins
Director of Operations
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303)-986-7900
Greg Bradley, Sevior VP - Development
Compark Owner II LLC
1500 North Halsted, 2nd Floor
Chicago, IL 60642
Jeff Kegg
Project Manager
Alcorn Construction Inc.
12081 W Alameda Pkwy #510
Lakewood, CO 80228
Phone #:(303) 906-4255 jeff@alcornci.com
Dustin Bouck
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(720) 814-7243
Randy Mitchell,
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303) 994-1715
Open 8 Consulting
Brian Garber
Qualified Stormwater Manager
4416 Lazy K Drive
Castle Rock, CO 80104
(303)-459-8336
Documents used and/or referenced in SWMP preparation.
Permits/Plans Associated with Jurisdictional MS4
Edge 470 Soils report (pdf)
DownloadSite compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by Stormpromax. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system is provided, as necessary, by Open 8 Consulting. To request access contact Open 8 at brian@open8.org
Stormpro max is accessed at the following address: https://www.stormpromax.com
Spill Response Plan (pdf)
DownloadFor Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGO. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system for this project is provided at: https//earthxswmp.us/
Assistance, or additional access priority can be provided by contacting Brian Garber (303)495-8336 or Matthew Fowler (719)922-4183
Copyright © 2023 EarthX Environmental - All Rights Reserved.
Powered by GoDaddy