Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

Elevation 25, BLDG 1 & 2

CDPHE Discharge Permit for Construction Activity COR-414683


Construction Start Date: 1/17/22

State of Colorado Permit Certification

COR400000 Amended January 2021 (pdf)Download
COR414683 Elevation 25 Permit (pdf)Download

Stormwater Management Plan

SWMP Elevation 25 (docx)

Download

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

active site plan 5-16-22 (png)

Download

ECP set (pdf)

Download

landscape plan (pdf)

Download

initial site map 2 (pdf)

Download

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

Limits of Construction for submittal (pdf)Download
Soils Information (pdf)Download
SITE INFORMATION FOR THE STORMWATER MANAGEMENT PLAN (docx)Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

BMP basic pack for plans (pdf)Download
Mead details (pdf)Download
ponds detail (pdf)Download

MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Files coming soon.

Site Contacts

Operator(s)/Permittee:

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Alcorn Construction Inc.

Derek Cummins

Director of Operations

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303)-986-7900 

Owner(s):

Operator(s)/Permittee:

Operator(s)/Permittee:

Stuart Platt, Partner

Elevation 25 Industrial Sponsor LLC

3801 E Florida Avenue, Suite 400

Denver, CO 80210

Phone number: (303) 332-4207

stuartplatt@silverpointdevelopment.

com

Project Manager:

Operator(s)/Permittee:

Project Manager:

  

Chris Barton

Project Manager

Alcorn Construction Inc.

12081 W Alameda Pkwy #510

Lakewood, CO 80228

Phone #:   720.919.5138   cbarton@alcornci.com 

Superintendent:

General Superintendent:

Project Manager:

  

Dustin Hazelwood

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 210-3718


General Superintendent:

General Superintendent:

General Superintendent:

  

Randy Mitchell,

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 994-1715 

Former Project Manager:

General Superintendent:

General Superintendent:

Bill Renz

Project Manager

Alcorn Construction Inc.

12081 W Alameda Pkwy #510

Lakewood, CO 80228


SWMP Prepared By:

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

  

EarthX Environmental

Brian Garber

Qualified Stormwater Manager


(303)-459-8336 

bgarber@earthx.us

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Staff Qualifications

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: https//earthxswmp.us/elevation-25

Assistance, or additional access priority can be provided by contacting Brian Garber  (303)495-8336 or Matthew Fowler (719)922-4183


Spill Response Procedures

Spill Response Plan (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

COMPLIANCE INSPECTION RECORDS

Section archived 8/25/2022

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by Stormpromax.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary, by EarthX Environmental.   To request access contact EarthX Environmental at bgarber@earthx.us


Stormpro max is accessed at the following address: https://www.stormpromax.com


Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers