CDPHE Discharge Permit for Construction Activity COR-419466
Construction Start Date: 5/9/2023
Specifications as approved by Jurisdictional MS4, site specific or modified details. Grading Details and landscape plans.
Jason Randels
Alcorn Construction Inc.
Jason Randels
V.P. of Operations
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303)-986-7900
John Torp, Senior Vice President
DV3 PROPERTY LLC
P.O. Box 158
Louviers, CO 80131
Phone number: 303-521-8890
Email: jtorp@brennanllc.com
Kim Kurtz-Ferraro
Project Manager
Alcorn Construction Inc.
12081 W Alameda Pkwy #510
Lakewood, CO 80228
Phone #: (720)513-4442
John Price
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303) 829-7375
Dustin Bouck
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(720) 814-7243
Randy Mitchell,
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303) 994-1715
EarthX Environmental
Brian Garber (303)-459-8336 bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Documents used and/or referenced in SWMP preparation.
Permits/Plans Associated with Jurisdictional MS4
Files coming soon.
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGO. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system for this project is provided at: https://app.compliancego.com/site/c4f5b9a6-dd89-4f45-88fe-54fee7144850
Pre-existing vegetation in previously disturbed areas