Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

MONTAINE FILING 4

CDPHE Discharge Permit for Construction Activity COR-414824


Construction Start Date: 2/2/2022

State of Colorado Permit Certification

COR414824 Montaine Filing 4 Cert (pdf)Download
COR400000 Amended January 2021 (pdf)Download
COR414824 Montaine Filing 4 Name change (pdf)Download

SWMP

Download PDF

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

archived map (pdf)

Download

Approved TESV21-0013 TESV maps (pdf)

Download

active map NW MF4 (png)

Download

active map SE MF4 (png)

Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

Details Approved TESV21-0013 TESV (pdf)Download
BMP basic pack for plans (pdf)Download

Site Contacts & Qualified Stormwater Managers

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

Jacob Pratt

Director of Purchasing

Brightland Homes

5660 Greenwood Plaza Blvd. Suite 101-N

Greenwood Village, CO 80111 

jpratt@brightlandhomes.com

Cell: (720) 480-3088

(designated as Qualified Stormwater Manager)


Superintendent Home Building

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

Wes Huffines

Area Manager

 whuffines@brightlandhomes.com

(970) 556-3996

5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111   (designated as Qualified Stormwater Manager)) 

Superintendent Home Building

Operator(s)/Permittee & Owner:

SWMP Preparation & Compliance Assitance:

Scott Harkins

Construction Manager

sharkins@brightlandhomes.com

(720) 610-5596

5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111   (designated as Qualified Stormwater Manager)

SWMP Preparation & Compliance Assitance:

SWMP Preparation & Compliance Assitance:

SWMP Preparation & Compliance Assitance:

EarthX Environmental
Brian Garber
(303)-459-8336
bgarber@earthx.us

 (designated as Qualified Stormwater Manager) 


Other Qualified Stormwater Managers

SWMP Preparation & Compliance Assitance:

Other Qualified Stormwater Managers

Staff Qualifications

SWMP Preparation & Compliance Assitance:

Other Qualified Stormwater Managers

 


Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

Soils Report (pdf)Download
Limits of Construction for submittal (pdf)Download
SITE INFORMATION FOR THE STORMWATER MANAGEMENT PLAN (docx)Download
Active area clarification 3-31-22 (pdf)Download
7_19_22 storm event memo RE adjacent permittee (pdf)Download
7/19/22 fuel spill report to CDPHE (pdf)Download

MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Approved TESV21-0013 TESV Report (pdf)

Download

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by Stormpromax.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary, by Open 8 Consulting.   To request access contact Open 8 at brian@open8.org


Stormpro max is accessed at the following address: https://app.compliancego.com/site/498bab63-bfff-4960-b7a8-6d942cf7d5a1

Spill Response Procedures

Spill Response Plan (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: https//earthxswmp.us/ 

Assistance, or additional access priority can be provided by contacting Brian Garber  (303)495-8336 or Matthew Fowler (719)922-4183


Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers