CDPHE Discharge Permit for Construction Activity COR-401047
Note: this is a SWMP update for an active project
morgan hill SWMP (pdf)
DownloadNote: Active Site maps are specifically indicated. Additional Maps are for reference.
MHP2 Active East copy (png)
DownloadMHP2 west active copy 2 (png)
Download1/19/23 PermitLOC (pdf)
DownloadMorgan Hill phase 1 June 2020 (pdf)
DownloadPhase II landscape plans (pdf)
DownloadMHP2 East archived 1-19-23 (pdf)
DownloadMhp2 initial map archived 9 15 21 (pdf)
DownloadMHP2 west archived 1-19-23 (pdf)
DownloadSpecifications as approved by Jurisdictional MS4, General Specifications & Grading Details
Jon Lee, Authorized Representative
Community Development Group of Erie, Inc.
2500 Arapahoe Ave. Suite 220
Boulder, CO 80302
(303) 588-4102
Travis Young (added 9/31/22
Project Manager
Community Development Group
2500 Arapahoe Ave. Suite 220
Boulder, CO 80302
(720) 724-0131
travis@cdgcolorado.com
(designated as Qualified Stormwater Manager)
EarthX Environmental (formerly Open 8 Consulting)
Brian Garber
(303) 495-8336
bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Removed 9/31/22
Wade Duncan
Project Manager
Community Development Group
2500 Arapahoe Ave. Suite 220
Boulder, CO 80302
(720) 347-5082
wade@cdgcolorado.com
(designated as Qualified Stormwater Manager)
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGO. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system for this project is provided at: https//earthxswmp.us/
Assistance, or additional access priority can be provided by contacting Brian Garber (303)495-8336 or Matthew Fowler (719)922-4183
Documents used and/or referenced in SWMP preparation.
Permits/Plans Associated with Jurisdictional MS4
Files coming soon.
Spill Response Plan (pdf)
DownloadFor Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by Stormpromax. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system is provided, as necessary, by Open 8 Consulting. To request access contact bgarber@earthx.us
Stormpro max is accessed at the following address: https://www.stormpromax.com