Stormwater Compliance Documentation for:

Peak Technology Campus - Building 1

CDPHE Discharge Permit for Construction Activity COR-411846


Construction Start Date: 4/6/2021

State of Colorado Permit Certification

COR411846_Peak Tech Bldg 1 (pdf)Download
COR400000 Amended January 2021 (pdf)Download
CDPS General Permit COR400000 Terminate 5-1-2023 (pdf)Download

Stormwater Management Plan

Peak Tec building 1 SWMP (docx)

Download

SWMP Amendment stockpile 5 13 21 (docx)

Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

BMP basic pack for plans (pdf)Download
Specification - FlocLoc 05-17 (pdf)Download
ponding berm structure (pdf)Download

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

Building 1 No Archive (pdf)

Download

Street Rough Work 6 24+21 (pdf)

Download

Sediment Basin (pdf)

Download

Stockpile Active Map (pdf)

Download

Peak Tech Building 1 Active Site (png)

Download

Site Contacts

Operator(s)/Permittee:

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Alcorn Construction Inc.

Derek Cummins

Director of Operations

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303)-986-7900 

Owner(s):

Operator(s)/Permittee:

Operator(s)/Permittee:

Greg Phillips, Director Of Aviation

Colorado Springs Airport

7770 Milton E. Proby Parkway, Suite 50

Colorado Springs, CO 80916

719.550.1910

gphillips@springsgov.com


Project Manager:

Operator(s)/Permittee:

Project Manager:

Bill Renz

Project Manager

Alcorn Construction Inc.

12081 W Alameda Pkwy #510

Lakewood, CO 80228

Phone #: 720-255-7467 brenz@alcornci.com 

Superintendent:

General Superintendent:

Project Manager:

  

  

John Price

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 829-7375

Jprice@alcornci.com



General Superintendent:

General Superintendent:

General Superintendent:

  

Randy Mitchell,

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 994-1715 

SWMP Prepared By:

General Superintendent:

General Superintendent:

  

Open 8 Consulting

Brian Garber

Qualified Stormwater Manager

4416 Lazy K Drive

Castle Rock, CO 80104

(303)-459-8336 

brian@open8.org

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Staff Qualifications

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

Peak soils report (pdf)Download
Limits of Construction (pdf)Download
Geotechnical Report from CTL datad 111120 (pdf)Download
Peak Tech documented use agreement 1 (pdf)Download
Peak Tech SITE INFORMATION FOR THE STORMWATER MANAGEMENT PLAN (docx)Download

MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Files coming soon.

Spill Response Procedures

Spill Response Plan (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: https//earthxswmp.us/ 

Assistance, or additional access priority can be provided by contacting Brian Garber  (303)495-8336 or Matthew Fowler (719)922-4183


COMPLIANCE INSPECTION RECORDS '

Section archived 8/26/22

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by Stormpromax.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary, by Open 8 Consulting.   To request access contact Open 8 at brian@open8.org


Stormpro max is accessed at the following address: https://www.stormpromax.com


Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers