Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

Site

CDPHE Discharge Permit for Construction Activity COR-421446


Construction Start Date: 9/15/23

State of Colorado Permit Certification

COR421446 - Primoris Permit Certification (pdf)

Download

COR400000 Amended January 2021 (pdf)

Download

PDF Viewer

Download PDF

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

Primoris-Map set (pdf)

Download

Control Measure Specifications

Specifications as approved by Jurisdictional MS4, General Specifications & Grading Details

grading details Primoris (pdf)

Download

BMP basic pack for plans (pdf)

Download

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

Limits of construction map (pdf)

Download

Soils Report_Primoris (pdf)

Download

Site Contacts

Operator(s)/Permittee:

Operator(s)/Permittee:

Operator(s)/Permittee:

  

Derek Simpson

Senor Vice President, Colorado

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(720) 470-6656

Owner(s):

Operator(s)/Permittee:

Operator(s)/Permittee:

Charles Ambrosio

Real Estate Project Mngr

Primoris   Services Corporation    

2300 N Field St #1900

Dallas, TX  75201

cambrosio@prim.com

(M) 972-5385316

Project Manager:

Operator(s)/Permittee:

Project Manager:

Chad Kalisak

Project Manager

Alcorn Construction Inc.

12081 W Alameda Pkwy #510

Lakewood, CO 80228

Phone #: (720) 400-5478

chad@alcornci.com

Superintendent:

Other Qualified Stormwater Managers

Project Manager:

  

John Price

Qualified Stormwater Manager

Alcorn Construction Inc.

12081 W. Alameda Pkwy., #510

Lakewood, CO 80228 

(303) 829-7375

jprice@alcornci.com



SWMP Prepared By:

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

EarthX Environmental Brian Garber (303)-459-8336  bgarber@earthx.us
(designated as Qualified Stormwater Manager)

 


Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Staff Qualifications

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at:  https://app.compliancego.com/site/6c470e9a-6e8c-4ca1-83be-8303c2bf6250


MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Files coming soon.

CONTACT INFORMATION

Spill response procedure

Spill Response

Division Low Risk Guidance

For Discharge of Stormwater  &  Other Activities Under the Groundwater Discharge Regulations

Dewatering of Stormwater Only (pdf)

Download

WQ LOW_RISK_POTABLE_WATER-2016 (pdf)

Download

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers