CDPHE Discharge Permit for Construction Activity COR-421446
Construction Start Date: 9/15/23
Note: Active Site maps are specifically indicated. Additional Maps are for reference.
Primoris-Map set (pdf)
Download
Derek Simpson
Senor Vice President, Colorado
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(720) 470-6656
Charles Ambrosio
Real Estate Project Mngr
Primoris Services Corporation
2300 N Field St #1900
Dallas, TX 75201
(M) 972-5385316
Chad Kalisak
Project Manager
Alcorn Construction Inc.
12081 W Alameda Pkwy #510
Lakewood, CO 80228
Phone #: (720) 400-5478
John Price
Qualified Stormwater Manager
Alcorn Construction Inc.
12081 W. Alameda Pkwy., #510
Lakewood, CO 80228
(303) 829-7375
EarthX Environmental Brian Garber (303)-459-8336 bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGO. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system for this project is provided at: https://app.compliancego.com/site/6c470e9a-6e8c-4ca1-83be-8303c2bf6250
Permits/Plans Associated with Jurisdictional MS4
Files coming soon.
For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations
Copyright © 2023 EarthX Environmental - All Rights Reserved.
Powered by GoDaddy