Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

PRPA (Waterline Reroute)

CDPHE Discharge Permit for Construction Activity COR-419606


Construction Start Date: 5/25/2023

State of Colorado Permit Certification

COR419606 Permit certification (pdf)

Download

COR400000 Amended January 2021 (pdf)

Download

PDF Viewer

Download PDF

Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

PRPA SWMP Base Maps (png)

Download

Control Measures

Link to Individual installation specifications
SPECIFICATIONS

Additional Control Measure Specifications

Specifications as approved by Jurisdictional MS4, site specific or modified details.  Grading Details and landscape plans.

BMP basic pack for plans (pdf)

Download

Site Contacts

Operator(s)/Permittee:

Project Manager/ Local Contact

Operator(s)/Permittee:

 Ryan Burke

Blackeagle Energy Services

Project Manager

230 Commerce Drive

Berthoud, CO 80513

Phone #:  (303) 746-3045 

Ryan.Burke@blackegl.com

Owner(s):

Project Manager/ Local Contact

Operator(s)/Permittee:

Chris Wood

Platte River Power Authority

Environmental Compliance Mangager

2000 E Horsetooth Rd

Fort Collins, CO 80525

Phone #: (970) 266-7906

woodc@prpa.org

Project Manager/ Local Contact

Project Manager/ Local Contact

Project Manager/ Local Contact

Tyson Larrick

Blackeagle Energy Services

Project Manager

230 Commerce Drive

Berthoud, CO 80513

Phone #: (970) 566-7726

 tyson.larrick@blackeagleenergyservices.com    

SWMP Prepared By:

Other Qualified Stormwater Managers

Project Manager/ Local Contact

EarthX Environmental 

Brian Garber (303)-459-8336  bgarber@earthx.us
(designated as Qualified Stormwater Manager)

 


Other Qualified Stormwater Managers

Other Qualified Stormwater Managers

Other Qualified Stormwater Managers



EarthX Qualified Staff

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

PRPA-WR-COMBINED_ADDENDUM-3_2-10-23 (pdf)

Download

Soils Report (pdf)

Download

PRPA SITE INFORMATION SIGN (pdf)

Download

MS4 specific Documentation

Permits/Plans Associated with Jurisdictional MS4 

Files coming soon.

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGO.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system for this project is provided  at: 

Assistance, or additional access priority can be provided by contacting Brian Garber  or Matthew Fowler 


CONTACT INFORMATION

Spill response procedures

Spill Response Procedures

Division Low Risk Guidance

For Discharge of Stormwater & Other Activities Under the G
Compliance Advisories

Pre-Existing conditions

Download PDF

Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers