CDPHE Discharge Permit for Construction Activity COR-415463
Construction Start Date: 6/27/2022
Jacob Pratt
Director of Purchasing
Brightland Homes
5660 Greenwood Plaza Blvd. Suite 101-N
Greenwood Village, CO 80111
Cell: (720) 480-3088
(designated as Qualified Stormwater Manager)
Wes Huffines
Area Manager
(970) 556-3996
5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111 (designated as Qualified Stormwater Manager)
Greg Geist
Construction Manager
ggeist@brightlandhomes.com
(303) 418-9453
5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111 (designated as Qualified Stormwater Manager)
EarthX Environmental
Brian Garber
(303)-459-8336
bgarber@earthx.us
(designated as Qualified Stormwater Manager)
Inspectors from EarthX Environmental
Brian Garber,
Matthew Fowler
Jim Daulton
Note: Active Site maps are specifically indicated. Additional Maps are for reference.
Timnath - Active Map (png)
DownloadDocuments used and/or referenced in SWMP preparation.
Site compliance inspections are performed as noted in the above SWMP document. Records of these inspections are maintained in a separate secure system maintained by ComplianceGo. This system tracks control measures requiring maintenance, control measures requiring corrective actions and certifying signatures of the Qualified Stormwater Manager.
Access to this system is provided, as necessary through the following link: https://app.compliancego.com/site/801ba08a-2827-47d6-ac5c-7068b3e9ba6b
For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations
pre-existing conditions (pdf)
DownloadCopyright © 2023 EarthX Environmental - All Rights Reserved.
Powered by GoDaddy