Open 8 Consulting
Open 8 Consulting
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
  • More
    • Home
    • Installation Details
    • Compliance Advisories
    • Spill Response
    • Solutions
    • CEOS
  • Home
  • Installation Details
  • Compliance Advisories
  • Spill Response
  • Solutions
  • CEOS
Stormwater Compliance Documentation for:

Timnath Landing F8

CDPHE Discharge Permit for Construction Activity COR-415463


Construction Start Date: 6/27/2022

State of Colorado Permit Certification

COR421402 - Timnath Landing Permit (pdf)Download
COR400000 Amended January 2021 (pdf)Download

StormWater Management Plan

Download PDF

Site Contacts & Qualified Stormwater Managers

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

Jacob Pratt

Director of Purchasing

Brightland Homes

5660 Greenwood Plaza Blvd. Suite 101-N

Greenwood Village, CO 80111 

jpratt@brightlandhomes.com

Cell: (720) 480-3088

(designated as Qualified Stormwater Manager)


Area Manager

Operator(s)/Permittee & Owner:

Operator(s)/Permittee & Owner:

 Wes Huffines

Area Manager

 whuffines@brightlandhomes.com

(970) 556-3996

5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111   (designated as Qualified Stormwater Manager)


Superintended Home Building

Operator(s)/Permittee & Owner:

SWMP Preparation & Compliance Assitance:

Greg Geist

Construction Manager

ggeist@brightlandhomes.com

(303) 418-9453

5660 Greenwood Plaza Blvd. Suite 101-N Greenwood Village, CO 80111   (designated as Qualified Stormwater Manager)

SWMP Preparation & Compliance Assitance:

SWMP Preparation & Compliance Assitance:

SWMP Preparation & Compliance Assitance:

EarthX Environmental
Brian Garber
(303)-459-8336
bgarber@earthx.us

 (designated as Qualified Stormwater Manager) 


Other Qualified Stormwater Managers

SWMP Preparation & Compliance Assitance:

Other Qualified Stormwater Managers

Inspectors from EarthX Environmental
Brian Garber,
Matthew Fowler
Jim Daulton

SWMP Preparation & Compliance Assitance:

Other Qualified Stormwater Managers

 


Site Plan(s)/Maps

Note: Active Site maps are specifically indicated.  Additional Maps are for reference.

Timnath - Active Map (png)

Download

GENERAL CONTROL MEASURE INSTALLATION SPECIFICATIONS

Site Reference and Other Documentation

Documents used and/or referenced in SWMP preparation. 

Soils Report_Timnath (pdf)Download
Timnath Landing Filing 8 Limits of construction (pdf)Download
TIMNATH SITE INFORMATION SIGN (pdf)Download

COMPLIANCE INSPECTION RECORDS

Site compliance inspections are performed as noted in the above SWMP document.  Records of these inspections are maintained in a separate secure system maintained by ComplianceGo.  This system tracks control measures requiring maintenance, control measures requiring  corrective actions and certifying signatures of the Qualified Stormwater Manager.   


Access to this system is provided, as necessary through the following link:  https://app.compliancego.com/site/801ba08a-2827-47d6-ac5c-7068b3e9ba6b

Spill Response & Reporting - General

Spill Response - To water or storm-sewer

Spill Response - To Land - Small

Spill Response - To Land - medium to large

Spill Response - To Land - Large

Division low risk Guidance

For Discharge of Stormwater & Other Activities Under the Groundwater Discharge Regulations

Compliance Advisories

Initial Site visit

pre-existing conditions (pdf)

Download

Copyright © 2023 EarthX Environmental - All Rights Reserved.

Powered by GoDaddy

  • 1875 Taylor - Colliers